WORK PRODUCT | ISO 26262 | PROCESS | DOCUMENT |
Organization-specific rules and processes for functional safety | 2 | 5.5.1 | 01_MANAGEMENT | Instruction Evidence |
Evidence of competence management | 2 | 5.5.2 | 01_MANAGEMENT | Instruction Evidence |
Evidence of a quality management system | 2 | 5.5.3 | 01_MANAGEMENT | Instruction Evidence |
Identified safety anomaly reports | 2 | 5.5.4 | 01_MANAGEMENT | Instruction Evidence |
Impact analysis at the item level | 2 | 6.5.1 | 01_MANAGEMENT | Instruction Evidence |
Impact analyses at element level | 2 | 6.5.2 | 01_MANAGEMENT | Instruction Evidence |
Safety plan | 2 | 6.5.3 | 01_MANAGEMENT | Instruction Evidence |
Safety case | 2 | 6.5.4 | 01_MANAGEMENT | Instruction Evidence |
Confirmation measure reports | 2 | 6.5.5 | 10_CONFIRMATION | Instruction Evidence |
Release for production report | 2 | 6.5.6 | 10_CONFIRMATION | Instruction Evidence |
Evidence of safety management | 2 | 7.5.1 | 01_MANAGEMENT | Instruction Evidence |
Item definition | 3 | 5.5.1 | 03_ITEM | Instruction Evidence |
Hazard analysis and risk assessment report | 3 | 6.5.1 | 04_HAZARDS | Instruction Evidence |
Verification report of the hazard analysis and risk assessment | 3 | 6.5.2 | 04_HAZARDS | Instruction Evidence |
Functional safety concept | 3 | 7.5.1 | 05_CONCEPT | Instruction Evidence |
Verification report of the functional safety concept | 3 | 7.5.2 | 05_CONCEPT | Instruction Evidence |
Technical safety requirements specification | 4 | 6.5.1 | 06_SYSTEM | Instruction Evidence |
Technical safety concept | 4 | 6.5.2 | 06_SYSTEM | Instruction Evidence |
System architectural design specification | 4 | 6.5.3 | 06_SYSTEM | Instruction Evidence |
Hardware-software interface (HSI) specification | 4 | 6.5.4 | 06_SYSTEM | Instruction Evidence |
Specification of requirements for production etc. | 4 | 6.5.5 | 06_SYSTEM | Instruction Evidence |
Verification report for system architectural design etc. | 4 | 6.5.6 | 06_SYSTEM | Instruction Evidence |
Safety analyses report | 4 | 6.5.7 | 06_SYSTEM | Instruction Evidence |
Integration and test strategy | 4 | 7.5.1 | 06_SYSTEM | Instruction Evidence |
Integration and test report | 4 | 7.5.2 | 06_SYSTEM | Instruction Evidence |
Safety validation specification | 4 | 8.5.1 | 06_SYSTEM | Instruction Evidence |
Safety validation report | 4 | 8.5.2 | 06_SYSTEM | Instruction Evidence |
Hardware safety requirements specification | 5 | 6.5.1 | 07_HARDWARE | Instruction Evidence |
Hardware-software interface specification (HSI) | 5 | 6.5.2 | 07_HARDWARE | Instruction Evidence |
Hardware safety requirements verification report | 5 | 6.5.3 | 07_HARDWARE | Instruction Evidence |
Hardware design specification | 5 | 7.5.1 | 07_HARDWARE | Instruction Evidence |
Hardware safety analysis report | 5 | 7.5.2 | 07_HARDWARE | Instruction Evidence |
Hardware design verification report | 5 | 7.5.3 | 07_HARDWARE | Instruction Evidence |
Specification of requirements related to production etc. | 5 | 7.5.4 | [07_HARDWARE | Instruction Evidence |
Analysis of the effectiveness of the architecture of the item | 5 | 8.5.1 | 07_HARDWARE | Instruction Evidence |
Verification review report of evaluation of the effectiveness of the item architecture | 5 | 8.5.2 | 07_HARDWARE | Instruction Evidence |
Analysis of safety goal violations | 5 | 9.5.1 | 07_HARDWARE | Instruction Evidence |
Specification of dedicated measures for hardware | 5 | 9.5.2 | 07_HARDWARE | Instruction Evidence |
Verification review report of evaluation of safety goal violations | 5 | 9.5.3 | 07_HARDWARE | Instruction Evidence |
Hardware integration and verification specification | 5 | 10.5.1 | 07_HARDWARE | Instruction Evidence |
Hardware integration and verification report | 5 | 10.5.2 | 07_HARDWARE | Instruction Evidence |
Documentation of the software development environment | 6 | 5.5.1 | 08_SOFTWARE | Instruction Evidence |
Software safety requirements specification | 6 | 6.5.1 | 08_SOFTWARE | Instruction Evidence |
Hardware-software interface (HSI) specification | 6 | 6.5.2 | 08_SOFTWARE | Instruction Evidence |
Software verification report | 6 | 6.5.3 | 08_SOFTWARE | Instruction Evidence |
Software architectural design specification | 6 | 7.5.1 | 08_SOFTWARE | Instruction Evidence |
Safety analysis report | 6 | 7.5.2 | 08_SOFTWARE | Instruction Evidence |
Dependent failures analysis report | 6 | 7.5.3 | 08_SOFTWARE | Instruction Evidence |
Software verification report | 6 | 7.5.4 | 08_SOFTWARE | Instruction Evidence |
Software unit design specification | 6 | 8.5.1 | 08_SOFTWARE | Instruction Evidence |
Software unit implementation | 6 | 8.5.2 | 08_SOFTWARE | Instruction Evidence |
Software verification specification | 6 | 9.5.1 | 08_SOFTWARE | Instruction Evidence |
Software verification report | 6 | 9.5.2 | 08_SOFTWARE | Instruction Evidence |
Software verification specification | 6 | 10.5.1 | 08_SOFTWARE | Instruction Evidence |
Embedded software | 6 | 10.5.2 | 08_SOFTWARE | Instruction Evidence |
Software verification report | 6 | 10.5.3 | 08_SOFTWARE | Instruction Evidence |
Software verification specification | 6 | 11.5.1 | 08_SOFTWARE | Instruction Evidence |
Software verification report | 6 | 11.5.2 | 08_SOFTWARE | Instruction Evidence |
Configuration data specification | 6 | C.5.1 | 08_SOFTWARE | Instruction Evidence |
Calibration data specification | 6 | C.5.2 | 08_SOFTWARE | Instruction Evidence |
Configuration data | 6 | C.5.3 | 08_SOFTWARE | Instruction Evidence |
Calibration data | 6 | C.5.4 | 08_SOFTWARE | Instruction Evidence |
Verification specification | 6 | C.5.5 | 08_SOFTWARE | Instruction Evidence |
Verification report | 6 | C.5.6 | 08_SOFTWARE | Instruction Evidence |
Software architectural design specification | 6 | C.5.7 | 08_SOFTWARE | Instruction Evidence |
Documentation of the software development environment | 6 | C.5.8 | 08_SOFTWARE | Instruction Evidence |
Safety-related content of the production plan | 7 | 5.5.1 | 11_PRODUCTION | Instruction Evidence |
Safety-related content of the production control plan | 7 | 5.5.2 | 11_PRODUCTION | Instruction Evidence |
Producibility requirements specification | 7 | 5.5.3 | 11_PRODUCTION | Instruction Evidence |
Production process capability report | 7 | 5.5.4 | 11_PRODUCTION | Instruction Evidence |
Safety-related content of the service plan | 7 | 5.5.5 | 12_OPERATION | Instruction Evidence |
Safety-related content of the service instructions | 7 | 5.5.6 | 12_OPERATION | Instruction Evidence |
Safety-related content of the information made available to the user | 7 | 5.5.7 | 12_OPERATION | Instruction Evidence |
Safety-related content of the decommissioning instructions | 7 | 5.5.8 | 12_OPERATION | Instruction Evidence |
Operation, service and decommissioning requirements specification | 7 | 5.5.9 | 12_OPERATION | Instruction Evidence |
Safety-related content of the rescue services instructions | 7 | 5.5.10 | 12_OPERATION | Instruction Evidence |
Control measures report | 7 | 6.5.1 | 11_PRODUCTION | Instruction Evidence |
Production process capability report | 7 | 6.5.2 | 11_PRODUCTION | Instruction Evidence |
Field observation instructions | 7 | 7.5.1 | 12_OPERATION | Instruction Evidence |
Supplier selection report | 8 | 5.5.1 | 01_MANAGEMENT | Instruction Evidence |
Development interface agreement (DIA) | 8 | 5.5.2 | 01_MANAGEMENT | Instruction Evidence |
Supplier's safety plan | 8 | 5.5.3 | 01_MANAGEMENT | Instruction Evidence |
Functional safety assessment report | 8 | 5.5.4 | 01_MANAGEMENT | Instruction Evidence |
Supply agreement | 8 | 5.5.5 | 01_MANAGEMENT | Instruction Evidence |
Configuration management plan | 8 | 7.5.1 | 01_MANAGEMENT | Instruction Evidence |
Change management plan | 8 | 8.5.1 | 01_MANAGEMENT | Instruction Evidence |
Change request | 8 | 8.5.2 | 01_MANAGEMENT | Instruction Evidence |
Impact analysis and change request plan | 8 | 8.5.3 | 01_MANAGEMENT | Instruction Evidence |
Change report | 8 | 8.5.4 | 01_MANAGEMENT | Instruction Evidence |
Verification plan | 8 | 9.5.1 | 09_VERIFICATION | Instruction Evidence |
Verification specification | 8 | 9.5.2 | 09_VERIFICATION | Instruction Evidence |
Verification report | 8 | 9.5.3 | 09_VERIFICATION | Instruction Evidence |
Documentation management plan | 8 | 10.5.1 | 01_MANAGEMENT | Instruction Evidence |
Documentation guideline requirements | 8 | 10.5.2 | 01_MANAGEMENT | Instruction Evidence |
Software tool criteria evaluation report | 8 | 11.5.1 | 02_SUPPORT | Instruction Evidence |
Software tool qualification report | 8 | 11.5.2 | 02_SUPPORT | Instruction Evidence |
Software component documentation | 8 | 12.5.1 | 08_SOFTWARE | Instruction Evidence |
Software component qualification report | 8 | 12.5.2 | 08_SOFTWARE | Instruction Evidence |
Software component qualification verification | 8 | 12.5.3 | 08_SOFTWARE | Instruction Evidence |
Hardware element evaluation plan | 8 | 13.5.1 | 07_HARDWARE | Instruction Evidence |
Hardware element test plan | 8 | 13.5.2 | 07_HARDWARE | Instruction Evidence |
Hardware element evaluation report for hardware elements | 8 | 13.5.3 | 07_HARDWARE | Instruction Evidence |
Description of candidate for proven in use argument | 8 | 14.5.1 | 01_MANAGEMENT | Instruction Evidence |
Proven in use analysis reports | 8 | 14.5.2 | 01_MANAGEMENT | Instruction Evidence |
Base vehicle manufacturer or supplier guideline | 8 | 15.5.1 | 02_SUPPORT | Instruction Evidence |
Safety rationale resulting | 8 | 16.5.1 | 02_SUPPORT | Instruction Evidence |
Update of architectural information | 9 | 5.5.1 | 02_SUPPORT | Instruction Evidence |
Update of ASIL as attribute of safety requirements and elements | 9 | 5.5.2 | 02_SUPPORT | Instruction Evidence |
Update of the ASIL attribute of the sub-elements of the element | 9 | 6.5.1 | 02_SUPPORT | Instruction Evidence |
Dependent Failures Analysis | 9 | 7.5.1 | 02_SUPPORT | Instruction Evidence |
Dependent Failures Analysis Verification Report | 9 | 7.5.2 | 02_SUPPORT | Instruction Evidence |
Safety analyses | 9 | 8.5.1 | 02_SUPPORT | Instruction Evidence |
Safety analyses verification report | 9 | 8.5.2 | 02_SUPPORT | Instruction Evidence |